This is a list of graduate theses course 2014
Year | Thesis ID | Thesis title | Student ID | Student name | Advisor |
2014 | MIE-B16001 | Hybird genetic algorithm to optimize drilling route for PCB substate | MIEIU13001 | Lê Hải Đăng | Assoc. Prof. Ho Thanh Phong |
2014 | MIE-B16003 | Re-design KPI and applying AHP to evaluate the performance of contract factory | MIEIU13007 | Nguyễn Thiện | Assoc. Prof. Ho Thanh Phong |
2014 | MIE-B16004 | Optimization of University Course Timetabling at International University – VNU HCMC | MIEIU13008 | Nguyễn Hữu Trí | Assoc. Prof. Ho Thanh Phong |
2014 | MIE-B16005 | Apply Job-shop Problem to Order picking problem | MIEIU13010 | Trần Quốc Đạt | Assoc. Prof. Ho Thanh Phong |
2014 | MIE-B16002 | Optimization of Distribution Network: A case study of Kuehne + Nagel VietNam | MIEIU13004 | Nguyễn Huỳnh Phương Nam | Dr. Nguyen Van Hop |
This is a list of graduate theses course 2015
Year | Thesis ID | Thesis title | Student ID | Student name | Advisor |
2015 | MIE-B16012 | Application of Analytic Network Process for Vendor Selection: A case Study of a Paint Company in Vietnam | MIEIU14006 | Phạm Ngọc Linh | Assoc. Prof. Ho Thanh Phong |
2015 | MIE-B16013 | Using simulation to Improve ground services in the airport – A case study at Jetstar Pacific Airlines. | MIEIU14016 | Vương Trần Quang Tuấn | Assoc. Prof. Ho Thanh Phong |
2015 | MIE-B17005 | Multi-objective Supply Chain Network Design for the Fresh Fruits and Vegetables in Southern of Vietnam | MIEIU14013 | Nhiêu Nhật Lương | Assoc. Prof. Ho Thanh Phong |
2015 | MIE-B16007 | Optimization resource-constrained project scheduling problem with stochastic duration time | MIEIU14003 | Lê Hữu Huy | Assoc. Prof. Ho Thanh Phong |
2015 | MIE-B16009 | Integrating Simulation and Optimization for Optimizing Hospital Operations: Case Study of Hospital 115 | MIEIU14008 | Nguyễn Trường Nguyên | Assoc. Prof. Ho Thanh Phong |
2015 | MIE-B16011 | Headcount Allocation Optimization: A case study at Vietnam Assembly and Test Manufacturing | MIEIU14005 | Nguyễn Hà Lê | Assoc. Prof. Ho Thanh Phong Dr. Pham Huynh Tram |
2015 | MIE-B16014 | Integrated Material Resource Planning with Stochastic Dynamic Considerations – A case study in Stock Order of Flint Group Southeast Asia | MIEIU14011 | Bùi Ngọc Duy Khái | Dr. Pham Huynh Tram |
2015 | MIE-B16010 | Intel VN Factory expansion Decision Making with Goal Programming | MIEIU14009 | Nguyễn Minh Tiến | Dr. Ha Thi Xuan Chi |
2015 | MIE-B16016 | Mathematical model for warehouse design – A case study for Scavi Bien Hòa’s warehouse. | MIEIU14014 | Võ Thống | Dr. Nguyen Van Chung |
2015 | MIE-B16008 | An analysis of storage assignment policy of automated storage and retrieval system (AS/RS) – A case study of AS/RS supplied by Hirata Corporation. | MIEIU14004 | Nguyễn Hoàng Huy | Dr. Nguyen Van Chung |
2015 | MIE-B16015 | Preventive Maintenance scheduling optimization: A case study in Vietnam assembly production link | MIEIU14010 | Nguyễn Viết Vinh | Dr. Phan Nguyen Ky Phuc |
2015 | MIE-B16006 | Car rental revenue optimization by using the improvement opportunity cost | MIEIU14002 | Trần Đức Huấn | Dr. Phan Nguyen Ky Phuc |
This is a list of graduate theses course 2016
Year | Thesis ID | Thesis title | Student ID | Student name | Advisor | |
1 | 2016 | MIE-B17001 | Optimizing man-machine ratio using simulation | MIEIU15002 | Nguyễn Thùy Dương | Assoc. Prof. Ho Thanh Phong |
2 | 2016 | MIE-B17002 | Multi-echelon and multi-objectives supply planning design – A case study in footwear outsourcing planning | MIEIU15006 | Võ Thành Thu | Assoc. Prof. Ho Thanh Phong |
3 | 2016 | MIE-B17003 | Optimization of operation and changeover time for production planning and scheduling in HDMT testers | MIEIU15003 | Hồ Nguyễn Huy Hoàng | Assoc. Prof. Ho Thanh Phong |
4 | 2016 | MIE-B17004 | Multi-objective optimization for bus planning and scheduling problems in HCM city, Vietnam | MIEIU15005 | Nguyễn Thanh Phong | Assoc. Prof. Ho Thanh Phong |
5 | 2016 | MIE-B17006 | Application of multi-objective planning and scheduling into the garment company – A case study of Ningbo penato trading office and An Do International manufacturing | MIEIU15004 | Nguyễn Hoàng Phương Linh | Assoc. Prof. Ho Thanh Phong |
6 | 2016 | MIE-B17007 | Supply Chain Cost optimization model – A case study in manufacturing company | MIEIU15001 | Trần Thị Hồng Diễm | Dr. Phan Nguyen Ky Phuc |
7 | 2016 | MIE-B17008 | Workforce scheduling to accommodate the variation of production loading of Intel Product Vietnam | MIEIU15007 | Trần Phạm Phương Trang | Dr. Phan Nguyen Ky Phuc |